Hi All,
We are in the process of integration of batch master creation in GBT system.
In ERP system, we have used batch level at material.So Batch number are created based on material level.
- We have integrated the class type (023) with Class type 223 in GBT system.As per the set up class type 023 is used as material level.
But when I trying to send BATMAS IDOC to GBT system, we are getting the error as
"Plant number is given, but the batch numbers are not plant-specific".
Please guide us the procedure to overcome this error.
Thanks
KB